MILESTONES

A focused path from concept to a patented system.
PRAESI’s progress is organised around a disciplined sequence: problem definition, system architecture, company formation, IP progression, investor readiness and the next proof-build stage.
Achieved
- November 2025: PRAESI Technologies Ltd incorporated in Nicosia, Cyprus (HE 483138).
- April 2026: PRAESI’s system patented, securing its priority date for international protection.
- June 2026: PRAESI Mission Control MVP built, a 26-screen macOS incident workspace with every response step behind explicit human authorisation.
- August to September 2026: Mutual NDAs signed with two European UAV and aerospace manufacturers; first airframe price offer received.
- September 2026: AWS Activate credits awarded for cloud development.
- October 2026: Accepted into the NVIDIA Inception program.
- October 2026: PRAESI Mission Control 2.0 released: one incident picture for the commander; release permissions that expire, stay bound to the target area and are checked against geofence, battery and failsafe state; an automatic hold when crewed aircraft are near; and a complete evidence record of every detection, decision and drop.
- October 2026: PRAESI Compute launched, our GPU service for forecasting and model testing. Its fire-growth model was tested once on 3,009 held-out 2025 Mediterranean fires (internal preliminary result). It advises; the commander decides.
- October to November 2026: Signed letters of participation and support received from: Republic of Cyprus: Cyprus Fire Service, Department of Forests, Department of Civil Aviation, The Cyprus Institute, University of Cyprus; Greece: National Observatory of Athens; France: SIS de la Haute-Corse, Toulouse INP, Nîmes Université; Italy: M.E.RIN; United States: NVIDIA.
- November 2026: Accepted into Microsoft for Startups and the Cloudflare for Startups programme, alongside AWS Activate and NVIDIA Inception.
- November 2026: Horizon Europe proposal (HORIZON-CL3-2026-01-SSRI-01) submitted on 3 November 2026 by a nine-partner consortium in four EU countries: research institutes, universities, an aerospace manufacturer and two fire and rescue services. Results are expected in spring 2027.
In progress
- SPM-30 bench and hardware-in-the-loop programme (Pixhawk / ArduPilot), technology readiness level 2-3.
- Ready to start building the complete system as soon as the first system is funded.
Next 6 to 12 months
- Q1 2027: SPM-30 laboratory validation (technology readiness level 4), with a public test summary.
- 2027: Simulation rehearsal of authorisation, link-loss and payload-release sequences before flight testing.
- 2027: First demonstration with a fire or civil-protection service.
- Seed round: Funds the proof-build, from SPM-30 laboratory validation to airframe integration and the first field demonstration.
Status as of November 2026. Concept visualisation. Final configuration remains subject to development.